2022
- Established New Building for Melting & Fettling area (Increased the production capacity up to 150 MT/Month)
- To establish new building for vacuum pouring and regular pouring, knock out and cutting
- Purchased lost foam press / vacuum pouring system
2021
- Established New Building for Wax injection
- Purchased Diesel Generator set 320 KVA
- Purchase wax auto injection press with 35 MT capacity
- Certified for Environmental ISO 14001 : 2015
- Certified for Health & Safety OHSAS 45001 : 2018
2020
- Purchased new shot blasting machine with 500 Kg/Batch capacity
- Purchased new melting penal with 375 KW capacity
2019
- Purchased new ERP software
- Purchased Unigraphics software (NX-11)
2018
- Purchase Plasma cutting machine make by Hypertherm USA
- Participate in Achema 2018 – Germany
- Increase Sale by 15%
2017
- Purchase Manual Wax injection machine
- Purchased 2 Nos. Turning center for Machining
- Installed separate line for special ceramic material coating
- 5s implementation in Process
- Lean manufacturing system in process
2016
- Approved Foundry by Marine Certification by ABS, DNV-German Lloyd & BVQUI
- Established Standard Room with CMM make by Carl Zeiss and Improve Inspection & testing facilities
- Purchased VTL machine
- Purchased double pelleted Vertical Milling Center.
- Improved material movement flow.
2015
- Established Machine shop
- Established New Building for fettling shop and Heat treatment
2014
- Increase Capacity in Machine Shop: Added CNC Machine with Dia 450 mm turning Capacity and one VMC
2013
- Increase Production Area: Constructed New building for Die/Mould Storage, Increase Wax Injection, Shelling Area and fettling area
2012
- Developed Critical component of Diapharm Pump with Ceramic Core for Crane ChemPhama flow solutions Germany
2011
- Increase Production and Export Double than 2010
- Participated in INDEE EXHIBITION 2011 at Bangkok Thailand
2010
- Certified and Approved by IBR (Indian Boiler Regd.)
- Participated in exhibition VALVE WORLD EXPO 2010 at Dusseldorf Germany
2009
- Certified by ISO 9001:2008, PED 97 23EC, AD-WO
- Started exports to France and UK
- Developed critical item with Ceramic Core for France and UK customer
2008
- Reached production up to 50% of total Capacity
- Started development for Export Market
- Installed Furnace capacity increased
2007
- Install Spectrometer & Started production with Super alloys, Inconel, Ni alloys, Duplex SS
2006
- Commissioning of Investment Casting Foundry with capacity of 25 Tons/Month