2022

  • Established New Building for Melting & Fettling area (Increased the production capacity up to 150 MT/Month)
  • To establish new building for vacuum pouring and regular pouring, knock out and cutting
  • Purchased lost foam press / vacuum pouring system

2021

  • Established New Building for Wax injection
  • Purchased Diesel Generator set 320 KVA
  • Purchase wax auto injection press with 35 MT capacity
  • Certified for Environmental ISO 14001 : 2015
  • Certified for Health & Safety OHSAS 45001 : 2018

2020

  • Purchased new shot blasting machine with 500 Kg/Batch capacity
  • Purchased new melting penal with 375 KW capacity

2019

  • Purchased new ERP software
  • Purchased Unigraphics software (NX-11)

2018

  • Purchase Plasma cutting machine make by Hypertherm USA
  • Participate in Achema 2018 – Germany
  • Increase Sale by 15%

2017

  • Purchase Manual Wax injection machine
  • Purchased 2 Nos. Turning center for Machining
  • Installed separate line for special ceramic material coating
  • 5s implementation in Process
  • Lean manufacturing system in process

2016

  • Approved Foundry by Marine Certification by ABS, DNV-German Lloyd & BVQUI
  • Established Standard Room with CMM make by Carl Zeiss and Improve Inspection & testing facilities
  • Purchased VTL machine
  • Purchased double pelleted Vertical Milling Center.
  • Improved material movement flow.

2015

  • Established Machine shop
  • Established New Building for fettling shop and Heat treatment

2014

  • Increase Capacity in Machine Shop: Added CNC Machine with Dia 450 mm turning Capacity and one VMC

2013

  • Increase Production Area: Constructed New building for Die/Mould Storage, Increase Wax Injection, Shelling Area and fettling area

2012

  • Developed Critical component of Diapharm Pump with Ceramic Core for Crane ChemPhama flow solutions Germany

2011

  • Increase Production and Export Double than 2010
  • Participated in INDEE EXHIBITION 2011 at Bangkok Thailand

2010

  • Certified and Approved by IBR (Indian Boiler Regd.)
  • Participated in exhibition VALVE WORLD EXPO 2010 at Dusseldorf Germany

2009

  • Certified by ISO 9001:2008, PED 97 23EC, AD-WO
  • Started exports to France and UK
  • Developed critical item with Ceramic Core for France and UK customer

2008

  • Reached production up to 50% of total Capacity
  • Started development for Export Market
  • Installed Furnace capacity increased

2007

  • Install Spectrometer & Started production with Super alloys, Inconel, Ni alloys, Duplex SS

2006

  • Commissioning of Investment Casting Foundry with capacity of 25 Tons/Month